DDC Daily Progress Report Generator

DDC Daily Progress Report Generator is an AI-assistant skill for construction reporting teams and developers, but its Python examples need setup and input validation. It organizes supplied site data, calculates labor and equipment totals, and produces text summaries or Excel workbooks. Automatic data collection is not implemented in the supplied code.

Researched 15 Nov 2026

In short.

DDC Daily Progress Report Generator is an AI-assistant skill for construction reporting teams and developers, but its supplied Python examples require setup and input validation. It provides structured site records, quantity-based activity statuses, labor and equipment calculations, text summaries and Excel export. The output formats retain different fields, and the Excel Summary sheet contains project details rather than calculated totals. Runtime reliability, host compatibility and operating costs are not established; no code was executed.

Researched and written by an AI model and checked by a second AI model. How it works

Coverage comprises the complete supplied folder 1_DDC_Toolkit/Analytics/daily-progress-report: SKILL.md, instructions.md and claw.json, plus the repository-level LICENSE and NOTICE.md, all at revision 410ed1e71e4a5c6fd231afd0c8d1e586a9f546e8. Other skills, the referenced book, external datasets, hosting software and provider services are outside this scope. Findings about calculations and omissions come from the supplied text. Installation, code execution, generated files, integrations, performance and operational reliability were not assessed.

The overview

Identity

The resource is daily-progress-report, published by DataDrivenConstruction in the Analytics area of its DDC construction skills repository. It contains SKILL.md with reference Python, instructions.md with assistant guidance, and claw.json with package metadata.

The original folder is [https://github.com/datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction/tree/main/1_DDC_Toolkit/Analytics/daily-progress-report]. The supplied files are pinned to revision 410ed1e71e4a5c6fd231afd0c8d1e586a9f546e8. The package metadata declares version 2.0.0.

Assessment

This is a useful starting point for a developer-assisted daily reporting workflow. The data structures and calculations are explicit enough to inspect and adapt, including separate records for work, labor and equipment.

Its practical boundary is the gap between assistant instructions and implemented functionality. The instructions request input validation and common file formats, but the reference code supplies neither validation routines nor file importers. It should be treated as an implementation starting point rather than a demonstrated end-to-end reporting service.

Users

Site managers and reporting coordinators could use the structure to standardize daily records when their team can supply reliable quantities, workforce details, equipment hours and weather observations. Developers and construction automation specialists are the clearest fit for adapting the Python and connecting existing data sources.

Beginners would need help configuring an assistant host or preparing the Python implementation. No graphical interface, guided installation or connection to a site-management platform is supplied. The repository notice also calls for qualified human oversight of safety-critical and binding construction decisions.

Capabilities

The report model holds project details, weather, temperatures, work activities, labor, equipment, delays, a safety incident count, visitors and deliveries. Calculations cover worker entries, regular labor hours, overtime hours, equipment hours, activity-status counts and delivery count.

Text output includes project and weather details, selected totals, activity counts, safety incident count and delay notes. Excel output creates a Summary sheet containing project details and adds Work Activities, Labor and Equipment sheets when those lists contain records.

CSV, Excel and JSON inputs are described in the assistant instructions, but no corresponding import routines are shown. Excel export and text generation are implemented in the reference code; CSV and JSON exports are only suggested by the instructions.

Using it

Requirements

The Python example imports pandas at module level and uses openpyxl for Excel writing. Both therefore need to be available for the implementation as written, although the skill metadata lists only python3. No dependency versions or exact minimum Python version are specified.

Metadata lists macOS, Linux and Windows. claw.json declares filesystem permission, instructions.md as its entry point, a minimum OpenClaw version of 0.8.0, and claude-* and gpt-* model patterns. These are compatibility declarations; working combinations are not established by execution evidence.

Users must supply the site data and a writable destination for Excel output. The shown Python contains no model API integration or automatic weather, sensor or project-platform connection.

Mechanism

The assistant instructions describe gathering user data and applying the methods in SKILL.md. The actual calculations use ordinary Python classes and fixed rules; a generative model is not required by those calculations.

DailyProgressReporter creates a report and appends activity, labor and equipment records. Activity status follows quantity comparisons: actual quantity at least equal to planned becomes completed, positive partial quantity becomes in progress, and zero actual against positive planned becomes delayed.

Regular labor hours equal the sum of workers multiplied by hours for each labor entry. Overtime is calculated separately, while equipment hours are summed directly. Activity crew size and activity hours do not feed these labor totals.

Setup

For assistant use, retain the three skill files together: claw.json names instructions.md as the entry point, and that file refers to SKILL.md. Host-specific installation commands and configuration details are not supplied.

For direct Python adaptation, place the reference definitions in a Python module, make pandas and openpyxl available, create a DailyProgressReporter, populate a report and choose an output path. This is an integration approach inferred from the example, not a documented installation package.

Define quantity units, temperature units and labor-hour conventions before connecting real records. The text formatter labels temperatures as Celsius, while the numeric fields themselves do not enforce a unit.

Example

The quick start creates a report for Office Tower A, records clear weather and a concrete slab activity with 150 m3 planned and 150 m3 actual, adds eight workers with ten regular hours and two overtime hours each, and requests daily_report.xlsx.

By inspection, the activity would be classified as completed. The labor inputs imply 80 regular worker-hours and 16 overtime worker-hours; the Excel Labor sheet's Total Hours expression combines them into 96. These are arithmetic deductions from the source, not observed execution results.

The text report's Total Man-hours field uses the regular-hours calculation, so it would exclude those 16 overtime hours. Teams need to account for this difference when comparing outputs.

Assessment & evidence

Limitations

The supplied code does not validate quantities, hours, worker counts, identifiers or equipment status values. A zero planned quantity and zero actual quantity are classified as completed. A positive planned quantity with zero actual is classified as delayed without checking dates or schedule expectations.

Total Workers sums labor-entry counts rather than identifying unique people. Repeated entries can therefore count the same person more than once. Regular hours and overtime are separate summary values, but Excel labor totals combine them.

The Excel Summary sheet omits calculated summary metrics, and the workbook omits delays, safety incidents, visitors and deliveries. Text output omits detailed activity, labor and equipment rows, visitors and deliveries. Neither output preserves every recorded field.

No scheduling, automatic collection, report delivery, persistence or construction-standard validation is implemented. Runtime reliability and performance are unassessed.

Reasoning

The strongest use case is consistent formatting and transparent arithmetic over data a team already has. The explicit record types and formulas make adaptation possible without relying on a model to invent totals.

The outputs require careful interpretation. Quantity completion does not establish schedule performance or acceptance of work. Labor hours measure effort, not productivity by themselves, despite the example labelling a labor-hours value as Productivity. A productivity measure would need a defined relationship between output quantity and labor input.

The business case claims relief from manual reporting work, but no timing study, accuracy benchmark or measured improvement is supplied.

Alternatives

For teams that only need structured totals and workbooks, adapting the supplied Python directly is an alternative to loading the assistant skill. The calculation methods themselves do not call a model.

A daily-report spreadsheet is another approach to consider for manual data entry; a reporting system with documented connectors would be relevant when automatic collection is essential. These are use-case comparisons inferred from this resource's boundaries. No named competitors, comparative results or alternative pricing are supplied.

Evidence

The available source consists of the skill's reference implementation and quick start, assistant instructions, package metadata, and the repository LICENSE and NOTICE.md. The implementation is embedded in SKILL.md rather than supplied as a separate Python module.

The pinned source folder is [https://github.com/datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction/tree/410ed1e71e4a5c6fd231afd0c8d1e586a9f546e8/1_DDC_Toolkit/Analytics/daily-progress-report].

No generated workbook, execution log, test suite or benchmark result is included in these files. No code was executed, so successful installation, workbook generation and assistant-host operation remain unassessed.

Access & freshness

Costs

The supplied files do not state a purchase price, subscription charge, model usage estimate or hosting cost. Operating cost is unknown and would depend on the chosen assistant host, model provider and deployment.

The shown Python performs calculations locally and contains no model API calls. That does not establish that an assistant-hosted workflow is free. The MIT licence permits use without a licence fee, subject to its notice requirements.

Rights

claw.json declares MIT, and the repository notice explicitly places skill instructions and documentation under MIT. LICENSE identifies DataDrivenConstruction as the 2026 copyright holder and permits use, modification and redistribution, including commercial use, provided the copyright and permission notice accompany copies or substantial portions.

The software is supplied without warranty. The repository notice gives separate terms for the DDC book and CWICR database; the skill's MIT terms should not be extended to those materials. Neither is loaded by the shown Python implementation.

Freshness

The source snapshot was captured on 15 November 2026 at 19:35:38.879 UTC, at revision 410ed1e71e4a5c6fd231afd0c8d1e586a9f546e8. Its metadata declares version 2.0.0 and minimum OpenClaw version 0.8.0.

The capture time does not establish a publication date or last substantive update. No dependency versions, compatibility test dates or release history are supplied. Changes after this revision are unknown.

Actions

Before routine use, verify the chosen Python dependencies and assistant host, define regular-hour and overtime conventions, and decide which recorded fields must appear in each output. Compare generated text and Excel reports with a hand-calculated example.

Include zero planned quantities, partial completion, repeated labor entries and overtime in that evaluation. Add input validation and import routines where needed, and revise exports if delays, deliveries, visitors or safety records must be retained.

Have the responsible construction professional confirm quantities, delay interpretations and safety-related content. Automatic collection, scheduling and delivery would require additional implementation.