In short.
pm-planning is a planning skill for developers using AI project-management agents, but it relies on great_cto workflow conventions and Beads rather than operating independently. Its strongest feature is a concrete handoff from approved architecture to small, dependency-linked tasks with explicit completion criteria. Integration details remain important: referenced planning components are not included, and the examples leave questions about task assignment and dependency flags. No commands or agent workflows were executed.
Researched and written by an AI model and checked by a second AI model. How it works
Covers the selected skills/pm-planning folder through its supplied SKILL.md at revision 12dfd86e99627cd6dd1ed394de4786f4ba08499b, together with the repository-level LICENSE and NOTICE.md. Excludes the rest of great_cto, referenced planning skills, agent definitions, gate configuration, Beads internals and third-party tools mentioned in the notices. No installation, command, generated plan or agent workflow was executed; runtime behavior, compatibility and productivity effects remain unassessed.
The overview
What it is
pm-planning is an instruction file at skills/pm-planning/SKILL.md in avelikiy/great_cto. It defines how the pm agent should turn an approved ARCH architecture document into a PLAN document for people and Beads tasks for a senior-dev agent. It is not a standalone application or a task scheduler.
The original resource location is [https://github.com/avelikiy/great_cto/tree/main/skills/pm-planning]. The file identifies its effort level as medium and declares Read, Write and Bash(bd:*) tool access.
Practical assessment
This is a useful fit when an agent already receives approved architecture and needs a consistent way to hand implementation work to other agents. It addresses vague task names, missing dependencies, unclear completion criteria and architecture that is not ready to implement.
Its value is the specificity of the planning instructions, not demonstrated automation or measured productivity gains. The file alone does not establish that an agent follows the rules reliably, that generated tasks are executable without clarification, or that the Beads integration works as illustrated.
Who it suits
The intended user is a developer or technical lead coordinating a pm agent, an architect and implementation agents. Experienced teams may find the explicit handoff contract useful; beginners can use the file to understand what a developer-ready task should contain.
It is less suitable for someone seeking help deciding the architecture itself. The skill starts after architecture approval and explicitly excludes nano archetypes, where the pm phase is skipped, and bug fixes with a one-line reproduction that do not need decomposition.
What it specifies
The skill specifies tasks of no more than four hours, one output artifact per task, explicit dependencies, named agent ownership and observable completion criteria. The artifact may be a code file, database migration, test file, documentation update or configuration change. Independent work should be represented as separate tasks so it can proceed in parallel.
Its PLAN template includes an architecture reference, cost estimate, prioritized tasks, Beads identifiers, a pre-mortem and workflow gates. It also tells the pm agent to return incomplete architecture for clarification when feature acceptance criteria, failure behavior or consistency with existing architectural decisions are missing.
Using it
Requirements and dependencies
The full workflow assumes an approved ARCH document, access to relevant architectural decision records, a pm agent able to read and write project documents, and the Beads bd command for creating and updating tasks. The declared document paths cover docs/architecture/ and docs/plans/.
The template additionally references cost-model, pre-mortem and GATES_BY_ARCHETYPE, including project-size-dependent gates. Their definitions are not present in the supplied material. Supported agent hosts, model requirements, Beads versions and installation requirements are not established.
How the planning works
The pm agent first checks whether the architecture is sufficiently explicit. If it is not, the prescribed response is a bd update with a re-arch label and blocked planning until the architect resolves the issue. Otherwise, the agent decomposes the feature, records the plan and creates dependency-linked Beads tasks.
The documented scheduler contract is bd ready --assignee senior-dev: tasks blocked on unfinished predecessors should not appear as claimable. Every task description should end with a Done when section. These are workflow instructions and expected tool behavior, not guarantees enforced by the Markdown file itself.
Getting it into a project
The file provides no installation command or host-specific skill-registration instructions. To adapt it, make the instruction file available to the pm role, supply the approved architecture and relevant decisions, and resolve the referenced planning conventions before relying on the complete workflow.
The revision-specific original file is available at [https://raw.githubusercontent.com/avelikiy/great_cto/12dfd86e99627cd6dd1ed394de4786f4ba08499b/skills/pm-planning/SKILL.md]. Beads setup, actual tool permissions and the connection to downstream agents must be established separately.
Example from the skill
The document splits an authentication feature into a user-table migration, signup endpoint, login with JWT issuance, logout or token revocation, and tests. Its command example creates a schema task, then a signup task linked to that predecessor with --blocks-on and labeled senior-dev.
The sample signup completion criteria require HTTP 201 with user_id on success, HTTP 400 with invalid_email for a bad address, HTTP 409 with email_taken for a duplicate, argon2 password hashing, unit-test coverage and a passing npm test command. These illustrate the required precision; they are not an implemented or verified authentication system.
Assessment & evidence
Limitations and ambiguities
The skill contains instructions rather than an implementation that enforces task quality. No generated plan, execution trace, benchmark or test result is supplied. The referenced agents, scheduler, cost model, pre-mortem and gate definitions are outside the available skill content.
Several details need resolution before automation. A heading names --blocks, while the example uses --blocks-on. Creation examples use --label senior-dev, but readiness is queried with --assignee senior-dev; the file does not show whether another step assigns those tasks. Actual Beads behavior is unverified.
Rule 1 caps tasks at four hours, while a later anti-pattern only explicitly prohibits tasks over eight hours. The earlier four-hour rule is stricter. The one-artifact rule also needs interpretation when completion criteria require both a code change and a separate test file.
Why the design may help
The central design choice is connecting a readable plan to a dependency-aware task queue. Clear completion criteria give the implementing agent a stopping condition, while explicit predecessors distinguish work that is ready from work still waiting on another result.
The architecture push-back rules are also practical: they discourage the pm agent from silently inventing success conditions or failure behavior. These are plausible benefits of the method, not demonstrated improvements in delivery speed, correctness or coordination.
When to use a simpler approach
The skill itself recommends bypassing pm decomposition for nano archetypes and bug fixes with a one-line reproduction. In the nano case, senior-dev claims one task directly. This avoids applying a multi-stage planning process where the work is already small and clear.
For a team without Beads or the great_cto agent roles, a human-maintained plan using the same dependency and completion-criteria principles is a simpler adaptation, not an equivalent automated integration. The evidence contains no comparison with another named planning skill or task system.
Evidence and boundaries
The technical findings are supported by skills/pm-planning/SKILL.md: its metadata, decomposition rules, command examples, PLAN template, push-back conditions and anti-patterns. The repository LICENSE and NOTICE.md establish the accompanying rights statements.
The wider repository capabilities described in NOTICE.md are not capabilities of pm-planning. No agent definitions, Beads implementation, referenced planning skills or external dependency documentation are included here, so their behavior and compatibility remain unassessed.
Access & freshness
Costs and effort
No purchase price, model usage, token consumption, infrastructure cost or Beads operating cost is specified. Total operating cost is unknown. The plan delegates cost estimation to a separate cost-model skill whose contents are not supplied.
The four-hour task limit is a planning rule, not a measured duration or a promise of savings. The medium effort label also does not establish a runtime or budget. The skill recommends having senior-dev complete an initial task before estimating the rest when the effort is genuinely uncertain.
Use and redistribution rights
The repository LICENSE grants MIT rights, including use, modification, redistribution, sublicensing and sale, provided the copyright and permission notice accompany copies or substantial portions. It names Copyright (c) 2026 avelikiy and disclaims warranties. The original license is at [https://raw.githubusercontent.com/avelikiy/great_cto/12dfd86e99627cd6dd1ed394de4786f4ba08499b/LICENSE].
NOTICE.md describes third-party material elsewhere in great_cto, including documentation under CC-BY-4.0 and separately licensed bundled skills. It does not identify pm-planning/SKILL.md as one of those adapted files. Preserve the accompanying notices and do not assume the root MIT license overrides file-specific terms when taking other repository components. The notice is at [https://raw.githubusercontent.com/avelikiy/great_cto/12dfd86e99627cd6dd1ed394de4786f4ba08499b/NOTICE.md].
Version and freshness
The available source snapshot is dated 17 November 2026 and pinned to repository revision 12dfd86e99627cd6dd1ed394de4786f4ba08499b. The main-branch resource address may change independently of that revision.
The supplied material does not establish a release number, the skill's last-edit date, a supported Beads version or later changes. The snapshot date should not be interpreted as the skill's publication or modification date.
Before adopting it
Confirm that the installed bd version accepts the illustrated dependency syntax and establish how labels relate to assignees in the downstream queue. Supply the missing cost-model, pre-mortem and gate definitions, and decide how the four-hour limit and one-artifact rule apply to tasks that require tests.
Start with one bounded feature whose architecture states success criteria and failure behavior. Inspect the resulting plan for declared dependencies, actionable ownership and verifiable completion criteria before handing it to implementation agents. Obtain the original instruction file from its revision-specific source and keep the license and attribution notices with redistributed copies.