In short.
Stakeholder Update is a Spanish-language AI skill for product managers and team leads writing executive updates, but its machine translation is awaiting review. It uses BLUF, meaning the conclusion comes first, and supplies detailed guidance for metrics, risks and decision requests. Optional instructions cover saved stakeholder context and approved message delivery. Installation compatibility, output quality, delivery behavior and operating costs are not established; nothing was executed.
Researched and written by an AI model and checked by a second AI model. How it works
Coverage includes i18n/es/skills/stakeholder-update/SKILL.md and the supplied repository-root LICENSE at revision c4679f94f2566c675e63b1ecece104190943d842. No other files are present in the supplied skill-folder material. The English original, referenced guides and template, professional-brain, SKILLSPEC.md, browser page and other repository skills are outside this evidence. Runtime compatibility, translation fidelity, generated output, context persistence and message delivery remain untested.
The overview
Identity
The resource is i18n/es/skills/stakeholder-update/SKILL.md in mohitagw15856/pm-claude-skills. It is an instruction file for an AI assistant, rather than a standalone reporting application. Its declared skill name is stakeholder-update.
The source folder is [https://github.com/mohitagw15856/pm-claude-skills/tree/main/i18n/es/skills/stakeholder-update]. The file identifies itself as a machine translation of skills/stakeholder-update/SKILL.md and explicitly marks translation review as pending.
Assessment
The strongest feature is its specificity about what makes a status update useful: a clear status and request at the start, metrics with targets and trends, risks connected to action, and decisions with options and deadlines. This gives an assistant substantially more direction than a request to summarize progress.
Its usefulness depends on accurate project information and editorial judgment. The file provides no measured evidence that generated updates are accurate, concise or useful to recipients. Spanish wording quality and adherence to the instructions were not assessed through execution.
Users
The intended users include product managers, engineering leads and project owners preparing Spanish-language communications for executives, cross-functional teams, boards or investors.
It adapts emphasis by audience: business outcomes for executives, sprint and architecture context for product or engineering leaders, dependencies for cross-functional teams, and traction or financial implications for boards and investors. Developers responsible for delivery reporting can use the technical audience guidance without turning the update into an activity log.
Capabilities
The prescribed output covers status, a one-sentence conclusion, an explicit request, three to five progress items, three to five key metrics, executive-level risks, milestones over 30 and 90 days, and decisions where needed. Metrics include current value, target, trend and status.
The file also supplies cadence guidance, audience adaptations, a worked example, quality checks and a four-part rubric worth up to 40 points. Its stated delivery threshold of 32 points is an author-defined target, not evidence of achieved quality.
Optional behavior includes reading and updating a professional-brain folder and sending an approved update through available communication tools. These are instructions for a capable host; the supplied file does not establish working integrations.
Using it
Requirements
The required information is the project or product, audience, reporting period, current status, and key metrics with current values and targets. The skill tells the assistant to request missing inputs.
AI-assisted use requires a host that can consume the instructions. No supported model, minimum version, installation format or tool API is specified. Communication tools are needed only for sending, and professional-brain is optional.
The file references a status-honesty guide, a separate update skeleton, professional-brain and SKILLSPEC.md. Their contents are not included in the supplied evidence, so their requirements and compatibility remain unknown.
Mechanism
The skill works through written instructions: establish context, lead with status and the main conclusion, summarize outcomes, compare metrics with targets, explain risks, and frame decisions. It does not supply executable reporting logic or a data connector.
Its rubric asks the status indicator to match the worst relevant metric. Risk reporting should connect facts, impact, action and the help required; decisions should include two or three options, costs or tradeoffs, a recommendation and a deadline.
If professional-brain exists, the assistant is directed to read stakeholder files, tone context and recent decisions, then record new requests or commitments. For sending, the file requires approval of the exact text and destination, followed by confirmation of delivery and identical text. Enforcement of these instructions is untested.
Setup
The captured instruction file is available at [https://raw.githubusercontent.com/mohitagw15856/pm-claude-skills/c4679f94f2566c675e63b1ecece104190943d842/i18n/es/skills/stakeholder-update/SKILL.md]. The evidence does not provide an installation command or runtime-specific loading procedure.
Before using it with an assistant, establish that host's documented way to load skill instructions and prepare the required project facts. The embedded reporting structure can also guide manual drafting. The source advertises a browser page, but its availability and behavior were not assessed.
Example
The included example concerns an onboarding redesign that shows improved completion but faces a billing integration delay. It opens with an at-risk status and asks stakeholders whether to launch onboarding separately or wait for billing.
It then connects metrics, blockers, mitigation dates and launch alternatives. The numbers, participant counts and dates belong to the illustrative example; they are not observed results from using this skill.
Assessment & evidence
Limitations
The Spanish translation is explicitly awaiting review. Several referenced supporting documents are unavailable in the supplied evidence, including the guide intended to calibrate risk status.
The skill cannot establish whether project metrics, forecasts or commitments are true. Its writing instructions and scoring rubric do not provide independent validation, and no generated output or tool behavior was tested.
Length guidance needs interpretation: the general target and final checklist require one page or a two-minute read, while monthly reviews may span two or three pages and quarterly reviews may use presentations. Optional saved-context instructions can also persist stakeholder information; access controls and retention behavior are unspecified.
Reasoning
The structure appears most useful when a team already has reliable project facts but struggles to turn them into a clear executive message. Targets and trends provide context, while explicit requests and decision deadlines tell recipients what action is needed.
That is an inference from the instructions, not demonstrated performance. The skill offers less help when the underlying problem is missing measurements, disputed delivery status or unclear ownership; those issues must be resolved before a polished update can be trustworthy.
Alternatives
A writer can manually follow the reporting structure embedded in this file when assistant loading or tool integration is unnecessary. This retains the format while leaving drafting and fact checking to the writer.
The file identifies an English source at skills/stakeholder-update/SKILL.md and a separate template for people who want to write their own updates. Neither is supplied here, so translation fidelity, completeness and relative quality cannot be compared. No competing product was assessed.
Evidence
The available material consists of the complete supplied Spanish SKILL.md and the repository-root LICENSE at revision c4679f94f2566c675e63b1ecece104190943d842. These support descriptions of the written behavior, translation warning and license terms.
They do not include model outputs, user studies, runtime logs, integration implementations or the linked supporting documents. Described capabilities are therefore prescribed behavior rather than verified execution.
Access & freshness
Costs
The supplied evidence contains no assistant pricing, subscription requirements, API usage figures or cost per update. Operating cost is unknown.
The MIT license grants permission free of charge. That permission does not establish the cost of an AI host, communication service or optional integration.
Rights
The supplied repository LICENSE is the MIT License, with copyright attributed to Mohit Aggarwal in 2026. It permits use, copying, modification, distribution, sublicensing and sale, provided the copyright and permission notices accompany copies or substantial portions.
The license disclaims warranty and liability. Its captured text is available at [https://raw.githubusercontent.com/mohitagw15856/pm-claude-skills/c4679f94f2566c675e63b1ecece104190943d842/LICENSE]. No separate skill-specific notice is supplied.
Freshness
The supplied snapshot was captured on 2026-11-16 at 23:50:31.029 UTC and is pinned to revision c4679f94f2566c675e63b1ecece104190943d842. The descriptions here apply to that revision.
The translation warning belongs to this snapshot. Later changes to the skill, its referenced documents or its translation status are unknown.
Actions
Prepare a reporting period, named audience, actual metrics with targets, material risks and any decision deadline. Use those facts to draft an update, then verify every number, status judgment, commitment and request against the underlying project information.
Have a fluent Spanish reader check wording before external use. Obtain and inspect referenced supporting files before relying on their guidance, and establish host compatibility before enabling optional saved context or delivery.
If using sending tools, follow the file's requirement to approve the exact message and recipients before delivery and confirm the resulting message afterward. No installation, drafting session, saved-context operation or delivery was executed for this report.