SkillsReviewed · deanpeters

EOL Process

EOL Process is an AI assistant skill for product managers retiring products or features, but teams must supply the facts and carry out the work. It provides six phases, decision gates, a tracker and worked examples, while referring to separate skills for detailed artifacts. Its repository license grants rights for noncommercial purposes.

Researched 16 Nov 2026

In short.

EOL Process is an AI assistant skill for product managers and technical leads coordinating a product retirement, but it guides decisions without performing the retirement. Its six phases place readiness, stakeholder alignment, operational planning and staff preparation before customer announcements, followed by closure and review. Context moves manually between independent skills, and the referenced artifact skills are outside this folder. Runtime compatibility and effectiveness are unassessed. The repository license does not grant commercial reproduction, sharing or adaptation.

Researched and written by an AI model and checked by a second AI model. How it works

Covers the complete folder plugins/pm-deliver/skills/eol-process: SKILL.md, template.md, examples/sample.md and examples/sample-industrial.md, plus the repository-root LICENSE notice, all at revision 476ae12917b8e77609eb956bcc2203a4e4ec857d. Excludes the remaining plugin, referenced companion skills, workshop-facilitation, pm-skills.config.yaml and linked repositories or frameworks. No installation, assistant execution, integration, migration or operational testing was performed; compatibility, gate adherence and real-world outcomes remain unassessed.

The overview

Identity

EOL Process, named eol-process in its metadata, is a Markdown instruction set in the pm-deliver plugin of deanpeters/Product-Manager-Skills. EOL means end of life: retiring a product, feature, internal tool or API. It is an assistant-loaded orchestration skill, rather than a standalone application.

The folder contains SKILL.md, template.md and two worked examples covering SaaS and industrial hardware. The original resource is at [https://github.com/deanpeters/Product-Manager-Skills/tree/main/plugins/pm-deliver/skills/eol-process].

Assessment

Its strongest feature is the ordering of commitments. A team checks whether retirement is defensible, discovers contractual and customer obligations, assigns work and prepares frontline staff before making public promises. The tracker makes those dependencies explicit.

It fits teams that need a structured conversation and a record of unresolved decisions. It offers less direct help with executing migrations or managing tasks in software. The documents establish a concrete method, but do not establish improved retention, fewer incidents or reliable assistant adherence.

Users

The primary audience is the person responsible for a complete product sunset, usually working across Product, Engineering, Legal, Finance, Sales, customer success and Support. It also addresses people inheriting a troubled retirement after an announcement.

A developer retiring an API or internal feature can use the lighter process. Commercial products with active customers receive more coordination, while revenue-critical or regulated hardware receives additional approvals, partner preparation and workstreams. Someone needing only one announcement or checklist may find a companion skill more direct.

Capabilities

The instructions organize retirement into Decide, Align, Plan, Prepare, Announce and Close. They cover readiness judgments, stakeholder conversations, an operational checklist, internal enablement, customer messages and a post-retirement review.

Decision options include proceeding, proceeding with conditions, holding, or stopping investment while retaining the product. The tracker records replacement readiness, owners, dates, approvals, assumptions and deferred decisions. Planning explicitly covers data, contracts, access and money; closure tracks transition results and retention against expectations.

A diagnostic maps problems such as overwhelmed Support, disputed commitments or broken downstream dependencies to phases that may need revisiting. These are prescribed activities and outputs, not demonstrated integrations or automated actions.

Using it

Requirements

Useful starting information includes the product being retired, the current stage, customer and revenue exposure, contracts, replacement readiness and who already knows. The skill permits sparse starting context, but meaningful decisions still depend on obtaining accurate organizational facts and talking to the responsible people.

The recommended route references five specialist artifact skills and workshop-facilitation for conversational behavior. It also mentions pm-skills.config.yaml for entry-mode configuration. Those files are outside this folder, and not every companion skill must be used. Supported assistant hosts, model requirements and software prerequisites are unknown.

Mechanism

The assistant follows written facilitation instructions and directs the user toward relevant artifacts. The route can start at any phase, revisit earlier decisions or compress work when the retirement is small. Context transfer consists of stating the intensity level and pasting prior material; no structured handoff schema is defined.

Level 1 covers lighter retirements, Level 2 is the default for commercial products, and Level 3 adds coordination for larger obligations. Entry modes offer guided questions, a context dump or a draft with labeled assumptions.

Key gates prevent an announcement before a viable transition path and staff readiness. Material stakeholder findings can send the process back to the retirement decision. These gates are instructions for people and the assistant, not demonstrated technical enforcement.

Setup

The supplied files do not establish an installation command or a supported assistant product. Loading procedures must therefore be confirmed for the intended host. The main instructions, tracker and examples should remain available together when preparing an authorized local copy.

A useful opening request names the product and current situation, such as a legacy reporting module whose retirement decision is made but planning has not started. Record the current phase, intensity level and replacement readiness in template.md. Before requesting a companion artifact, confirm that the corresponding skill is available and carry forward the relevant findings.

Examples

The SaaS example follows a dispatch product being replaced by a newer service. Customers with custom dispatch rules become an announcement condition, while stakeholder conversations uncover undocumented API integrations and an internal billing dependency. The same replacement gap remains visible through planning, communication and the closing review.

The industrial example demonstrates reversal. Existing service contracts and an unready retrofit path overturn the initial retirement decision. The revised route stops new sales while retaining service obligations and leaves the final EOL date unscheduled until explicit conditions are met.

These are worked examples, not independently established customer outcomes. Their account counts, revenue, retention figures and completed milestones should not be treated as measured performance of the skill.

Assessment & evidence

Limitations

The folder supplies instructions and documents, without demonstrated task-system integration, automated migration, customer messaging, shutdown controls or persistent state management. The specialist artifact skills and facilitation protocol are referenced but their contents are unavailable here.

An assistant cannot establish contract obligations, hidden dependencies or actual replacement readiness from this template alone. Dates, approvals and customer commitments require validation by the relevant owners. Execution, installation, model compatibility and operational outcomes have not been assessed.

The sizing ranges are not hard limits: the industrial example describes roughly 30 months with work still open, exceeding the general Level 3 range of 12–24 months.

Practical reasoning

The method is useful because retirement risk often comes from commitments and dependencies discovered after a public date has been promised. Checking those facts earlier gives a team room to change the date, reduce the scope or stop the retirement.

Requiring staff preparation before announcements addresses a different risk: inconsistent promises from unprepared customer-facing teams. Tracking retention and unresolved closure work also makes success broader than a completed shutdown checklist. The documents support these design choices, while their actual effectiveness remains unknown.

Alternatives

The instructions identify narrower companion skills: eol-readiness-advisor for the retirement decision, eol-stakeholder-sequence for alignment, eol-checklist for the operational plan, eol-internal-enablement for frontline preparation and eol-message for customer communication. Each is described as usable independently.

Those are documented roles, not a comparative assessment of their full contents or quality. The supplied template also offers a manual tracking option when an assistant-guided conversation is unnecessary, although it still depends on real stakeholder work.

Evidence

The evidence consists of the complete skill instructions, tracker template, SaaS example, industrial example and repository-root license at one source revision. Together they establish the intended behavior, document structure and licensing terms. They do not establish successful execution or independently verified retirement outcomes.

The revision-specific source folder is [https://github.com/deanpeters/Product-Manager-Skills/tree/476ae12917b8e77609eb956bcc2203a4e4ec857d/plugins/pm-deliver/skills/eol-process]. Linked companion skills, external frameworks and the separate product-manager-prompts repository are references rather than additional substantive evidence here.

Access & freshness

Costs

The supplied files establish no purchase price, required subscription, model usage, token consumption or cost per session. Assistant-provider charges and the operational cost of a retirement are unknown.

The metadata estimates 30–60 minutes for planning. The process gives indicative execution ranges from days or weeks for lighter retirements to months or years for larger ones. These are planning estimates, not measured completion times or guarantees.

Rights

The repository LICENSE states Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International. Its grant permits reproduction, sharing and adaptation for noncommercial purposes. Sharing requires retaining supplied attribution and notices, identifying modifications and including the license text or a link. Shared adaptations must use the same license elements under the permitted version or compatibility terms.

The license does not grant commercial reproduction, sharing or adaptation; separate commercial permission is unknown. It also disclaims warranties. The captured notice is available at [https://raw.githubusercontent.com/deanpeters/Product-Manager-Skills/476ae12917b8e77609eb956bcc2203a4e4ec857d/LICENSE].

Freshness

The source snapshot was captured on 2026-11-16 at 21:52:10.136 UTC, pinned to revision 476ae12917b8e77609eb956bcc2203a4e4ec857d. A release number and last-maintained date are not established by these files. Later repository changes are unknown.

The SaaS example describes closure in March 2027, and the industrial example includes milestones through 2028. These scenario dates extend beyond the capture date and cannot establish outcomes already achieved at capture or indicate when the skill was released.

Next steps

Confirm the license permissions needed for the intended use and the loading mechanism supported by the chosen assistant. Obtain any companion skills needed for the phases being used.

Start with the actual retirement stage and a proportionate intensity level. Record the transition path, unresolved obligations and named owners in the tracker, leaving unsupported dates unscheduled. Have responsible teams validate commitments, dependencies, customer consequences and staff readiness before an announcement. Carry those findings forward when changing phases.

Evidence for this report

LICENSEnotice · checked 2026-11-16