SkillsReviewed · rsmdt

Feature Prioritization

Feature Prioritization is an AI assistant skill for product teams and developers comparing roadmap options, but its rankings depend on input quality and its reference contains scoring errors. It provides six prioritization frameworks, a RICE worksheet and structured decision documentation.

Researched 16 Nov 2026

In short.

Feature Prioritization is an AI assistant skill for product managers and developers deciding what to build next, but its worked examples need checking and its behavior in an assistant has not been assessed. It guides framework selection, scoring, trade-offs and decision documentation across six methods. The weighted-scoring reference miscalculates two totals; supported assistant hosts, operating costs and improvements to real decisions are unknown.

Researched and written by an AI model and checked by a second AI model. How it works

Covers the complete supplied plugins/team/skills/cross-cutting/feature-prioritization folder at commit e803d51fdb423271d3dde189f5416f3ec51386a9: SKILL.md, reference/frameworks.md and examples/rice-template.md, plus the repository-root LICENSE notice. Other repository skills, plugin infrastructure and host documentation are outside this scope. Nothing was executed. Installation, assistant adherence, output quality and real-world prioritization outcomes were not assessed.

The overview

Identity

The resource is the feature-prioritization skill folder in rsmdt/the-startup. It contains SKILL.md, reference/frameworks.md and examples/rice-template.md. Its purpose is to guide an AI assistant through feature comparisons, roadmap planning and build-versus-defer decisions.

The original folder is at [https://github.com/rsmdt/the-startup/tree/main/plugins/team/skills/cross-cutting/feature-prioritization]. The supplied files correspond to commit e803d51fdb423271d3dde189f5416f3ec51386a9.

Assessment

Its useful contribution is a repeatable discussion structure: choose a method suited to the available information, expose the calculations, explain trade-offs and record when deferred decisions should be revisited. The worksheet gives beginners a concrete starting point.

Treat the scores as decision aids requiring review. Arithmetic errors in the weighted example reduce confidence in copying its numbers directly, and the documentation does not establish that using the skill improves roadmap outcomes.

Users

The described tasks suit product managers, engineering leads and developers comparing competing software initiatives. Teams defining release scope can use MoSCoW; teams comparing measurable opportunities can use RICE or economic delay costs.

Beginners receive scoring scales and examples. Experienced teams receive configurable criteria and structured decision fields, but must supply their own product evidence, constraints and estimates.

Capabilities

The reference covers RICE, Value versus Effort, Kano, MoSCoW, Cost of Delay divided by duration, and custom Weighted Scoring. It includes formulas, categorization guidance, survey questions and a decision template.

The skill asks the assistant to explain framework choice, distinguish measurements from estimates, expose scoring, discuss trade-offs and cross-check high-stakes decisions with a second framework. Its proposed output records item names, scores or categories, ranks, rationales, a recommendation and a review date.

Using it

Requirements

Useful inputs depend on the method. RICE needs reach over a consistent period, per-user impact, confidence and effort in person-months. Cost of Delay needs economic loss estimates and implementation duration. Kano needs paired survey responses; MoSCoW needs release constraints; Weighted Scoring needs agreed criteria, weights and scores.

The files assume an assistant can receive a target through $ARGUMENTS and consult companion Markdown. They do not identify supported hosts, model versions, installation dependencies or hardware requirements.

Mechanism

SKILL.md describes an instruction-driven sequence: assess the backlog and available data, select a framework, consult the reference, calculate scores or assign categories, compare trade-offs and document the decision. The interface and state definitions describe intended information structures; an implemented API is not established.

RICE uses reach × impact × confidence / effort. Weighted Scoring sums each criterion score multiplied by its weight. The instructions assign 50% confidence when information is missing and request explicit assumptions; that convention does not supply the missing evidence.

Setup

Retain SKILL.md with reference/frameworks.md and examples/rice-template.md in their original relative locations. SKILL.md explicitly directs the assistant to the reference; downloading only that file omits the detailed methods and worksheet.

To use the material, an assistant needs access to the instructions and relevant companion file, plus the target and candidate features. Automatic $ARGUMENTS substitution depends on the host. No installation command or verified host-specific setup is supplied.

Example

The RICE worksheet illustrates CSV export with reach of 6,000 users, impact 2, confidence 80% and effort 0.5 person-months. Its score is (6,000 × 2 × 0.80) / 0.5 = 19,200. Scheduled email reports score 5,600.

A date-range picker scores 16,000 but is excluded from the open-roadmap ranking because the example says it was already committed to a partner. This illustrates why commitments must accompany numerical rankings. These are teaching scenarios, not evidence of measured outcomes from using the skill.

Assessment & evidence

Limitations

The Weighted Scoring table lists Feature A as 3.95 and Feature C as 3.85. Applying the listed weights to their row values gives 3.90 for both. Feature B also totals 3.90, so the displayed inputs produce a three-way tie. The subsequent calculation for A correctly shows 3.9, contradicting its table entry.

Estimated inputs can create precise-looking rankings without strong evidence. The fixed 50% confidence convention does not validate an estimate. No executed assistant behavior, automatic data collection, integration compatibility or real-world decision improvement is established.

Reasoning

The framework-selection guidance is useful because different questions need different evidence: user reach supports RICE, economic timing supports Cost of Delay, and release boundaries support MoSCoW. Requiring visible calculations and assumptions makes disagreements easier to inspect.

The resulting order remains conditional on those inputs. A confidence percentage acts as a scoring adjustment; the material does not establish that it is a calibrated probability. A sensible review should ask whether plausible changes to estimates would change the recommendation.

Alternatives

Within the resource, Value versus Effort offers quick categorization with limited data, while MoSCoW defines release scope. Kano addresses satisfaction using survey responses. RICE compares reach-adjusted impact per effort; Cost of Delay emphasizes economic urgency; Weighted Scoring accommodates organization-specific criteria.

The worksheet and reference can also support a human-led session without assistant execution. The supplied material does not establish comparative advantages over other skills or dedicated prioritization products.

Evidence

The evidence consists of the skill instructions, framework reference, RICE worksheet and repository-root licence. These establish documented methods and reuse terms. They do not establish successful assistant execution, model compliance or improvements to product outcomes.

The captured instructions are available at [https://raw.githubusercontent.com/rsmdt/the-startup/e803d51fdb423271d3dde189f5416f3ec51386a9/plugins/team/skills/cross-cutting/feature-prioritization/SKILL.md].

The companion files are available at [https://raw.githubusercontent.com/rsmdt/the-startup/e803d51fdb423271d3dde189f5416f3ec51386a9/plugins/team/skills/cross-cutting/feature-prioritization/reference/frameworks.md] and [https://raw.githubusercontent.com/rsmdt/the-startup/e803d51fdb423271d3dde189f5416f3ec51386a9/plugins/team/skills/cross-cutting/feature-prioritization/examples/rice-template.md]. The licence is at [https://raw.githubusercontent.com/rsmdt/the-startup/e803d51fdb423271d3dde189f5416f3ec51386a9/LICENSE].

Access & freshness

Costs

The MIT licence grants permission to use and copy the material free of charge. Assistant subscription fees, model usage, token consumption and total operating cost are unknown because no host or pricing information is supplied.

Dollar amounts in the Cost of Delay examples represent hypothetical business losses, not charges for this skill.

Rights

The supplied repository-root MIT licence permits use, copying, modification, publication, distribution, sublicensing and sale. Copies or substantial portions must retain the copyright notice and permission notice.

The notice names Rudolf Schmidt and states copyright 2025-current. The material is supplied without warranty, and the licence disclaims author liability.

Freshness

This report describes commit e803d51fdb423271d3dde189f5416f3ec51386a9, captured on 16 November 2026 at 14:32:58 UTC. Capture time does not establish when the files were written or last changed.

No release version or commit date is supplied. Changes after this snapshot, including possible corrections to its examples, are unknown.

Actions

Begin with a small backlog and traceable inputs. Agree on a common reach period, effort units and confidence basis before scoring. Keep unknown inputs visible, document existing commitments and independently recompute totals, especially the weighted examples.

For consequential decisions, compare a second framework, examine how changed estimates affect the order and record trade-offs and a review date. Confirm that the intended assistant can access the companion files before relying on the skill in recurring planning.

Evidence for this report

LICENSEnotice · checked 2026-11-16