In short.
Together AI's A/B testing guide helps developers compare model deployments on live requests, but it requires a working control deployment and leaves the method for choosing a winner unspecified. Experiments divide the control's existing traffic share among that control and up to 19 variants. The page explains CLI and console setup, percentage changes, promotion and stopping. Pricing, statistical decision rules and measured outcomes are unknown; nothing was executed or tested.
Researched and written by an AI model and checked by a second AI model. How it works
Coverage is limited to the complete supplied documentation text at [https://docs.together.ai/docs/dedicated-endpoints/ab-tests.md], including its routing warning, examples, image descriptions and Mintlify hosting attribution. Linked documentation, the documentation index, console destinations and referenced image files were not assessed. No installation, execution, live traffic experiment, billing check or performance measurement was performed.
The overview
Identity
Run an A/B test is a Together AI documentation guide for dedicated endpoints at [https://docs.together.ai/docs/dedicated-endpoints/ab-tests.md]. It explains how one endpoint can route live requests between a baseline deployment, called the control, and candidate deployments, called variants.
The resource is an operational guide to an existing service feature. Its examples use the tg CLI, while a separate walkthrough describes the Together AI console.
Assessment
The guide is useful when you already serve requests through a Together AI endpoint and want to expose a limited share to a candidate before promoting it. It explains important routing conditions, including why variants must stay outside the endpoint's regular traffic split.
Its strongest coverage is experiment configuration and lifecycle management. It does not explain how to score model responses, determine statistical significance or decide how long an experiment should run. Those decisions need a separate evaluation method.
Users
The primary audience is developers and engineers responsible for serving model requests through Together AI dedicated endpoints. Beginners get definitions and a console walkthrough; experienced developers get CLI commands, multi-variant behavior and concurrency guidance for SDK or API updates.
Readers starting without a deployment will need additional setup instructions. The page links to deployment creation but does not include that procedure.
Capabilities
An experiment supports exactly one control and between one and 19 variants. The CLI can create a variant deployment and start an experiment, add another variant to the same control's experiment, change a variant's percentage and delete an experiment.
The console supports creating, editing and stopping tests after the necessary deployments exist. The guide also describes promotion through a rollout with detachment or through manual endpoint traffic-weight changes.
Using it
Requirements
You need a READY control deployment that receives endpoint traffic and a model to use as a variant. Variants must have regular endpoint traffic weight 0 or no assigned weight; a non-zero variant weight prevents the test from starting.
Experiment member percentages must total 100. CLI creation and percentage changes accept integer variant percentages from 1 to 99, and the control must retain at least 1%. A control with regular traffic weight 0, or absent from the endpoint traffic split, supplies no requests to the experiment.
CLI installation, authentication steps, compatible CLI or SDK versions and deployment capacity requirements are not specified on this page.
Mechanism
The endpoint first identifies traffic destined for the control, then assigns those requests across the experiment members using their configured percentages. Other deployments' regular traffic shares are unaffected. Experiment percentages therefore apply to the control's share, which may be smaller than the endpoint's total traffic.
Changing one variant through the CLI adjusts the control's percentage and leaves other variants unchanged. SDK or API updates use the members update mask and replace the entire member set, so every member must be resent. Supplying the current ETag is documented as protection against concurrent changes.
Deleting the experiment immediately restores the endpoint's regular traffic split. This normally sends the experiment's traffic back to the control, but a changed regular split can instead route it to a promoted variant.
Setup
For the CLI path, the guide first routes traffic to the control with tg endpoints update dep_control123 --traffic-weight 1. It then starts a 5% variant using tg endpoints ab ml_CbJNwQC2ZqCU2iFT3mrCh --control dep_control123 --percent 5 --name sampling-tweak-v1. These IDs are documentation examples and must be replaced with your own.
Keep the returned experiment ID for editing or deleting the test and the variant deployment ID for ramping or promotion. Send inference requests using the endpoint string in the model field.
For the console path, create the variant deployment first at regular traffic weight 0. Open the endpoint's Traffic Tests tab, select New A/B test, name the experiment, choose the control and variants, and assign percentages totaling 100. The form requires at least two deployments, including a running deployment already serving traffic.
Example
If the control initially receives all endpoint traffic, a 5% variant configuration allocates 95% to the control and 5% to the variant. Using the example variant ID, tg endpoints update dep_variant456 --ab-percent 10 changes the configured allocation to 90% control and 10% variant.
Adding a second variant at 10% takes that allocation from the control, producing 80% control, 10% first variant and 10% second variant. If the control instead received only half of total endpoint traffic, a variant assigned 10% of its share would receive 5% of total endpoint traffic. This last figure is an illustrative calculation from the documented routing rules; none of these allocations are measured results.
Assessment & evidence
Limitations
Assignment is described per request. Stable assignment by user or session is not established, so the page does not support assuming that one person will consistently receive the same deployment.
The guide does not provide minimum sample sizes, stopping criteria, statistical calculations or instructions for attributing response quality to each variant. It links to per-deployment observability guidance without including those measurement details.
Stopping an experiment and cleaning up its deployments are separate operations. The deployment teardown procedure is linked rather than included.
Reasoning
The fixed split supports a bounded comparison: a candidate receives some real requests while the control continues serving the remainder. Because the experiment subdivides only the control's share, understanding that starting share is necessary to interpret candidate exposure and sample volume.
This routing arrangement enables comparison but does not establish that a candidate improves quality, latency or cost. A useful decision requires measurements and success criteria beyond the configuration steps documented here.
Alternatives
The guide offers two setup interfaces: the CLI creates variant deployments automatically, while the console provides form-based configuration after deployment creation. For promotion, it describes a rollout with --detach and a manual traffic-weight approach followed by experiment deletion.
A rollout serves the different goal of moving traffic to a chosen deployment; an A/B test maintains a comparison split until changed or stopped. The page does not compare other providers, experimentation products or offline evaluation methods.
Evidence
The evidence is the complete supplied text of Together AI's Run an A/B test page at [https://docs.together.ai/docs/dedicated-endpoints/ab-tests.md]. It includes commands, console procedures, routing constraints and image descriptions.
These instructions support an account of documented behavior, not independent confirmation that commands succeed or traffic is distributed as described. No commands, API calls, console operations or model requests were executed, and no performance results are available.
Access & freshness
Costs
The page provides no prices, billing units, free allowances or experiment fees. Deployment charges and any additional cost associated with running variants are unknown.
The CLI creates variant deployments, while the console requires them to exist beforehand. The page does not establish how experiment percentages affect billing or whether stopping an experiment changes deployment charges.
Rights
No explicit license for the documentation or example commands appears in the supplied page. Permission to redistribute the complete page is therefore not established.
Model licenses, service terms and the handling or retention of live request data are not described. The footer identifies Mintlify as the documentation hosting platform, which does not establish reuse rights.
Freshness
The supplied page was captured on 24 November 2026 at 03:21:36.390 UTC. The text provides no publication date, last-updated date or compatible CLI and SDK versions.
The capture establishes the documented instructions at that time. Subsequent changes, current service availability and compatibility with a particular installed client are unknown.
Actions
Before starting, confirm that the control is READY and has non-zero regular traffic weight, and that every variant has weight 0 or no assigned weight. Define the measurements and decision criteria separately, then use the guide's small initial allocation, such as 5%, if it suits the experiment.
Retain the experiment and deployment IDs. When updating through an SDK or API, resend every member and use the current ETag to guard against concurrent changes.
For promotion, the page recommends tg endpoints rollout dep_variant456 --blue-green --detach, substituting your variant ID. To stop an experiment, use its console action or tg endpoints rm abx_abc123 with your experiment ID. Check the regular endpoint traffic split before stopping, because that split determines where requests go afterward; deployment cleanup requires the separate teardown instructions.
