In short.
Together AI’s rollout guide explains live deployment changes for developers and platform engineers, but cancellation freezes traffic rather than restoring the previous split. It documents three rollout strategies, deployment eligibility, capacity budgets, optional metric gates and CLI and console controls. A rollout transfers the source deployment’s traffic share while other deployments retain theirs. GPU availability, billing standing and replica readiness can delay progress. Exact prices, application compatibility and operational reliability are not established by this page, and none of its commands or deployment behavior was tested.
Researched and written by an AI model and checked by a second AI model. How it works
Coverage is the complete Start a rollout page at [https://docs.together.ai/docs/dedicated-endpoints/rollouts.md], including its CLI and console instructions, strategy table, eligibility requirements, capacity budgets, monitoring, cancellation, reverse rollouts, states, limitations and troubleshooting notices. Linked pricing, metric-gate, deployment, scaling, experiment, CLI-reference and documentation-index pages are excluded. Live capacity, exact costs, version compatibility, performance and operational outcomes were not assessed through execution.
The overview
Identity
Start a rollout is Together AI documentation for migrating traffic between two deployments under the same dedicated endpoint [https://docs.together.ai/docs/dedicated-endpoints/rollouts.md]. The endpoint URL stays unchanged while the target deployment takes over the source’s traffic share.
This is a feature guide with CLI examples and console instructions. Its scope includes rollout creation, monitoring, lifecycle controls, rollback through a reverse rollout and troubleshooting.
Assessment
The guide is useful for teams already serving models on Together AI dedicated endpoints who need to change a model version or engine configuration under live traffic. Its strongest material explains what happens during pauses, cancellation, capacity shortages and failed starts.
The documented controls support staged exposure and operational recovery. The page does not establish zero downtime, improved model answers, application compatibility or measured deployment reliability.
Users
The main audience is developers and platform engineers responsible for production model-serving endpoints. Choosing replica budgets, interpreting metric gates and managing frozen traffic shares requires familiarity with deployment operations.
Beginners can use the console walkthrough, but the guide assumes an existing endpoint and deployments. CLI installation, authentication and the underlying deployment setup are not explained on this page.
Capabilities
Canary rollouts move traffic in steps, with a default ladder of 5%, 25%, 50% and 100%. Each step holds traffic steady for a soak period, meaning a waiting period before progression. Custom steps, intervals and optional metric gates are supported. Blue-green moves traffic in one step after the target is ready. Rolling replaces replicas in batches while keeping combined capacity approximately constant.
Operators can pause, resume, promote or cancel a rollout. CLI retrieval and console views expose progress, step states, metric-gate verdicts and history. Traffic-shift events include old and new traffic percentages.
Using it
Requirements
Both deployments must belong to the same endpoint. The documented source requirements include a positive traffic weight and either READY state or SCALING with at least one ready replica and a ready routing tier. A DEGRADED source requires an explicit max-unavailable allowance. The target may be READY, STOPPED or SCALING, and must not already receive 100% of endpoint traffic.
Neither deployment may have a stop in progress, an enabled inactivity timeout or a conflicting A/B or shadow-experiment role. Eligibility is checked at both creation and start. The target’s project must remain in good billing standing for creation, start and subsequent target scale-ups.
Hardware availability must support the chosen strategy and final target size. The page directs users to regional headroom for the target instance type, but supplies no live capacity figures.
Mechanism
The rollout coordinates replica changes and traffic routing while the source drains. Only the source’s traffic share is transferred; unrelated deployments retain their shares. A stopped target is restarted as it scales up. When deployments are still scaling, the first traffic shift waits for sufficient ready replicas; failure to reach the required capacity within 30 minutes can pause the rollout with UNDER_SERVED.
Metric or health failures can pause progression rather than reverse traffic automatically. Recoverable system pauses may retry every 15 minutes for up to three hours. Operator pauses never automatically resume.
Setup
Prepare eligible source and target deployments, confirm the source’s traffic weight, set both inactivity timeouts to 0 and check billing and GPU headroom. In the endpoint’s Rollouts tab, select New rollout, choose both deployments and select a strategy. The console defaults to canary and allows automatic or custom steps, optional final target replicas and an optional metric gate.
Capacity budgets control rollout behavior. Max surge applies only to canary and caps target replicas added per step; autoscaler additions do not count toward it. Max unavailable permits missing source replicas and can release source capacity before replacements are ready. Releasing source capacity helps the target only when both use the same GPU type.
Start immediately begins the migration; disabling it creates a pending rollout. The CLI also supports target experiment detachment through --detach, but a conflicting source experiment must be detached separately.
Example
The page’s custom-canary example is tg endpoints rollout dep_target456 --canary --steps 25,50,75,100 --interval 300s. It illustrates four traffic steps with a 300-second interval. dep_target456 is a placeholder for an eligible target deployment. This command was not executed.
A separate example configures router_latency with p95 aggregation, a 30000-millisecond threshold, the lt operator and a 300-second metric window. That illustrates a latency gate; it does not establish an appropriate threshold for another workload. Progress can be retrieved with tg endpoints get rol_abc123, replacing the placeholder with the actual rollout ID.
Assessment & evidence
Limitations
An endpoint permits only one active rollout, including pending and paused rollouts. While active, it blocks traffic-split edits, stopping or deleting either deployment and assigning either deployment to conflicting experiments. A failed start can leave a pending rollout occupying this slot.
Cancellation preserves the current split and requires a reverse rollout or later traffic edits to consolidate service. Rollouts cannot be edited after creation. Lowering target max replicas below a step’s requirement pauses progression. A rollout may raise that maximum permanently, while final-target-replicas specifies cutover capacity rather than a lasting autoscaling floor.
The page contains inconsistent guidance about an unreferenced source: the requirements demand a positive traffic weight, while the CLI checklist says a rollout can start without shifting traffic if the source is absent from the split. Confirm a positive source weight before proceeding; actual create/start behavior for that inconsistent case is unassessed.
Reasoning
The documented trade-offs favor canary when gradual exposure and observation matter, blue-green when a quick switch justifies full overlapping capacity, and rolling when limiting concurrent GPU capacity matters more than completion speed. Actual timing and cost depend on deployment sizes, hardware and readiness.
A latency gate alone cannot establish answer correctness or task quality. That is an inference from what the illustrated gate measures. The page supplies no demonstrated application-quality evaluation or benchmark validating its strategy comparisons.
Alternatives
The page identifies manual traffic-split editing as an alternative to an orchestrated migration. For a one-off comparison between deployments, it recommends an A/B test or shadow experiment.
The linked traffic-routing, A/B-testing and shadow-experiment guides are outside this page’s scope. Their detailed capabilities, requirements and costs are not assessed here, and the evidence supports no comparison with other providers.
Evidence
The evidence is Together AI’s complete Start a rollout documentation page [https://docs.together.ai/docs/dedicated-endpoints/rollouts.md]. It provides commands, console procedures, state definitions, operational constraints and troubleshooting categories.
These are vendor-documented behaviors. The evidence contains no execution results, measured latency or cost benchmarks, or observed recovery outcomes. No commands, endpoint requests or deployment changes were executed.
Access & freshness
Costs
Source and target deployments are both billed while they overlap. Blue-green brings the target to full size before switching, briefly requiring roughly twice the usual replica count. The documentation describes it as the most expensive strategy and rolling as the cheapest; these are documented comparisons, not measured cost results.
GPU rates, billing granularity and numerical rollout totals are absent, so exact cost is unknown. Cancellation before any traffic moves can leave a running target with no traffic. Deleting a rollout record does not stop deployments or remove their traffic weights.
Rights
The supplied page states no licence or redistribution permission for its text or command examples. It also does not establish service terms, model-serving rights, data-retention terms or ownership rules for model outputs. Those rights remain unknown from this evidence.
Freshness
The supplied page capture is dated 24 November 2026 at 03:31:23.050 UTC. The page states no publication date, last-update date, CLI version or API version. Compatibility with a particular installed CLI and changes after that capture are unknown.
Actions
Before using the guide, confirm deployment eligibility, a positive source traffic weight, disabled inactivity timeouts, billing standing and regional GPU headroom. Obtain applicable pricing and choose a strategy that fits the available overlap capacity.
For canary, choose steps, soak timing and gate thresholds appropriate to the workload and replica warm-up time. Monitor rollout state, step results and traffic events. Plan recovery as a reverse rollout, including the possibility of serving a frozen pair after cancellation.
After completion or cancellation, inspect actual traffic weights, running replicas and autoscaling bounds. Restore intended inactivity settings and address any unused deployment that remains running.
