CWICR Change Order Processor

cwicr-change-order is an AI assistant skill for construction estimators and developers, but it requires separate cost data and corrections to its example code. It illustrates pricing quantity changes, applying overhead and profit, comparing budgets and exporting Excel documentation. The cost database has separate commercial-use licensing, and runtime behavior has not been assessed.

Researched 17 Nov 2026

In short.

cwicr-change-order is an AI assistant skill for construction teams and developers, but its example code needs corrections and the cost database has separate licensing. Its Python implementation prices quantity changes, applies configurable overhead and profit, compares project budgets and exports Excel workbooks. Missing work-item codes silently receive zero cost, project summaries include all approval statuses, and an unimported Tuple annotation can prevent loading where annotations are evaluated eagerly. No code was executed; runtime compatibility, pricing accuracy and practical performance remain unverified.

Researched and written by an AI model and checked by a second AI model. How it works

Coverage comprises the complete supplied folder 1_DDC_Toolkit/CWICR-Database/cwicr-change-order: SKILL.md, claw.json and instructions.md, plus the repository-level LICENSE and NOTICE.md, all at revision 410ed1e71e4a5c6fd231afd0c8d1e586a9f546e8. The external CWICR database, referenced book chapter, other repository skills and live upstream changes are outside this coverage. No installation, model interaction, Python execution, dataset validation or Excel export was performed.

The overview

Identity

cwicr-change-order is a DataDrivenConstruction skill for AI assistants working with the CWICR construction cost database. The folder contains SKILL.md with reference Python code, instructions.md with assistant guidance, and claw.json with host metadata. The manifest declares version 2.0.0 and names instructions.md as its entry point.

The original source folder is [https://github.com/datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction/tree/main/1_DDC_Toolkit/CWICR-Database/cwicr-change-order]. The supplied snapshot is tied to revision 410ed1e71e4a5c6fd231afd0c8d1e586a9f546e8.

Assessment

The resource provides an inspectable starting point for drafting change-order calculations from known quantities and unit costs. Developers can follow the arithmetic and adapt the data structures, while estimators can see which quantities, rates and markups produce a proposed budget change.

Adoption requires correcting implementation gaps and checking the cost data. The source's claims of fair pricing and quick turnaround are not supported by price-validation results, timing measurements or documented project outcomes. The supplied material does not establish readiness for binding commercial estimates.

Users

Likely users include construction estimators, quantity surveyors and project cost managers who already have work-item codes, original and revised quantities, and an agreed basis for pricing. A developer is needed to turn the embedded Python example into a dependable application or agent integration.

Beginners can use the examples to understand how quantity changes affect a budget, but Python setup, data preparation and error handling are still required. The repository notice calls for qualified professional review of estimates and verification of prices, quantities and classifications before binding use.

Capabilities

The reference class creates numbered change orders, records line items, stores change types and statuses, calculates direct cost and markups, and accepts a manually entered schedule impact. It also provides a quick calculation without creating a change order, comparison against a supplied project budget, and a project-wide summary.

Excel export creates Summary, Items and Totals sheets. Although the assistant instructions mention CSV, Excel, JSON and direct input, the supplied Python example demonstrates loading a Parquet cost table and exporting Excel. CSV and JSON import or export implementations are not supplied.

Using it

Requirements

The skill metadata lists Python 3 and macOS, Linux and Windows. The code uses pandas, specifies openpyxl for Excel output, and needs a compatible Parquet backend for the quick-start data load. Exact Python and dependency versions are not specified.

For meaningful pricing, the cost table needs unique work_item_code values and appropriate labor_cost, material_cost, equipment_cost and unit fields; description supplies line descriptions when available. Quantities and rates must use consistent units. The selected folder does not include the referenced cost database.

claw.json declares filesystem permission, OpenClaw version 0.8.0 or later, and claude-* and gpt-* model patterns. These are compatibility declarations; actual host and model compatibility has not been assessed.

Mechanism

The class indexes a pandas table by work_item_code. It calculates each unit rate by adding labor, material and equipment costs, then multiplies both original and revised quantities by that same rate. Their difference becomes the line's cost impact, rounded to two decimal places.

Rounded line impacts are summed into direct impact. The defaults add 12% overhead, then calculate 8% profit on direct impact plus overhead. Before final rounding, this makes the total 1.2096 times direct impact. Both rates are configurable, and the same arithmetic applies to negative net changes.

Change orders are held in an in-memory dictionary. Budget comparison uses an original budget and previously approved changes supplied by the caller. Schedule days are entered manually and summed; the code does not calculate a construction schedule.

Setup

Obtain the three skill files from the pinned source folder and keep their references intact. For an agent integration, claw.json points to instructions.md, which directs the assistant to SKILL.md. The files do not provide a complete host installation procedure.

For Python use, prepare the dependencies and a compatible cost table, extract the reference implementation into a module, and address its missing Tuple import before use in environments that evaluate annotations eagerly. Then initialize CWICRChangeOrder with the table and agreed markup rates. Dataset acquisition, column mapping and validation require separate work.

Example

The quick start reads TR_workitems_costs_resources_DDC_CWICR.parquet, creates CO-001 for Building A, and adds work item EXCV-002 for additional foundation work. Original quantity is zero and revised quantity is 150. Neither the table nor a price for that code is included in the supplied files.

If the code resolves to a valid unit cost c, the example's direct impact is 150 × c before rounding. With the default markups, overhead is 18 × c and profit is 13.44 × c, giving a total of 181.44 × c before rounding. This is a calculation derived from the source, not an observed result. The export example names change_order_001.xlsx as its output.

Assessment & evidence

Limitations

get_unit_cost annotates its return with Tuple, but Tuple is absent from the typing imports. This can prevent class definition where annotations are evaluated eagerly. Missing work-item codes or an absent code index return zero cost and a generic unit without an error, creating a risk of silent underpricing.

The code does not enforce unique codes, valid numeric inputs, consistent units or a pricing currency. Budget comparison divides by original_budget without guarding against zero. Original and revised work use the same unit rate, so the substitution label alone cannot price a material or method replacement with a different rate.

Project summaries total all stored change orders, including drafts and rejected orders. Schedule impacts are simply added across those orders. Change orders have no durable storage, and reusing a change-order number overwrites the existing dictionary entry.

Justification is stored on the change-order object but omitted from the Excel export. No supplied results establish calculation accuracy, data quality, supported data volumes or operational reliability.

Reasoning

The calculation model is most suitable for quantity changes where both quantities can legitimately use one agreed unit rate. Its explicit arithmetic and editable markup rates make the pricing assumptions visible for professional review.

Suitability becomes uncertain when a change requires historical original rates, different replacement rates, contract-specific credit rules or schedule analysis. The assistant instructions request input validation and construction best practices, but the reference code does not implement enough controls to establish those outcomes.

Alternatives

The supplied material contains no comparison with named competing products. For a small number of quantity changes, a reviewed spreadsheet could express the same quantity and markup arithmetic. A developer could also adapt the reference into a validated Python module with explicit error handling and durable storage. These are inferred implementation options, not assessed alternatives.

Teams requiring approval histories, contract-specific pricing and schedule dependencies would need to assess software that provides those functions. The linked OpenConstructionEstimate-DDC-CWICR repository is presented as a data resource; the supplied evidence does not establish it as a replacement change-order application.

Evidence

The source material comprises the folder's SKILL.md, claw.json and instructions.md, together with the repository LICENSE and NOTICE.md at the same revision. The implementation is embedded in SKILL.md rather than supplied as a separate Python module.

The immutable implementation source is [https://raw.githubusercontent.com/datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction/410ed1e71e4a5c6fd231afd0c8d1e586a9f546e8/1_DDC_Toolkit/CWICR-Database/cwicr-change-order/SKILL.md]. No dataset, dependency lockfile, automated tests, execution logs or completed project outputs are included. Findings about behavior come from reading the supplied code; nothing was executed.

Access & freshness

Costs

The software and documentation are offered under MIT terms without a stated purchase fee. The repository notice says commercial use of the DDC CWICR compilation requires a separate DDC commercial license. Its price is unknown.

Model-provider charges, hosting costs, integration effort and ongoing support costs are not established. The 12% overhead and 8% profit defaults are construction pricing assumptions, not charges for using the skill. Currency, geographic applicability and the date basis of the example's prices are unspecified.

Rights

The captured LICENSE identifies copyright 2026 DataDrivenConstruction and grants MIT rights for the software and documentation. Redistribution must retain the copyright and permission notices. NOTICE.md explicitly places skill instructions and documentation under MIT and states that the material is supplied without professional-advice guarantees.

The cost data has different terms. NOTICE.md describes the DDC CWICR compilation as CC BY-NC 4.0 and requires a separate DDC commercial license for commercial use. Underlying national price data remains subject to its issuers' terms. The MIT grant for this skill does not establish commercial rights to the database referenced at [https://github.com/datadrivenconstruction/OpenConstructionEstimate-DDC-CWICR].

Freshness

The supplied snapshot was captured on 2026-11-17 at 08:36:11.129 UTC from revision 410ed1e71e4a5c6fd231afd0c8d1e586a9f546e8. claw.json declares skill version 2.0.0. Capture time does not establish a release date or the date of the underlying prices.

The files do not establish the last maintenance date, current dependency compatibility or whether the live main branch has changed since capture. The referenced cost database's revision, pricing dates and geographic coverage are unknown.

Actions

Before using this skill for a project, establish database-use rights and verify the relevant prices, dates, location, currency and units. Confirm that every requested code exists and that the table has unique codes and valid numeric costs. Agree overhead, profit and deletion-credit rules with the responsible professionals.

Correct the Tuple import, replace silent zero pricing with explicit errors, guard budget calculations, and define how status affects project totals. Add separate original and replacement rates where needed, preserve records durably, and include justification in exported documentation.

Then check known-price additions, deletions and modifications, missing codes, zero budgets, status filtering and Excel output against independently calculated expectations. These are recommended verification steps; no execution results are available.

Evidence for this report