DDC Change Order Processor

Change Order Processor is an AI assistant skill for construction project teams, but its Python example keeps records in memory and does not enforce who may approve changes. It provides change-order costing, review statuses, contract summaries and Excel exports.

Researched 17 Nov 2026

In short.

Change Order Processor is an AI assistant skill for construction managers and developers tracking project changes, but shared use requires stronger recordkeeping and approval controls. It combines assistant instructions with embedded Python code for itemized costs, schedule-impact entries and Excel logs. Default overhead and profit are each 10%, with profit applied after overhead. Runtime behavior, host compatibility and claimed processing benefits remain untested.

Researched and written by an AI model and checked by a second AI model. How it works

Covers the complete supplied change-order-processor folder: SKILL.md, claw.json and instructions.md at revision 410ed1e71e4a5c6fd231afd0c8d1e586a9f546e8, together with the repository-root LICENSE and NOTICE.md. Other skills, the referenced book, external standards and the CWICR database are excluded. No code was executed, dependencies installed, assistant host exercised or live project journey demonstrated. Runtime reliability, compatibility, actual time savings and deployment costs remain unknown.

The overview

Identity

Change Order Processor belongs to DataDrivenConstruction's DDC Skills for AI Agents in Construction repository. Its selected folder contains SKILL.md, instructions.md and claw.json. The original source folder is [https://github.com/datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction/tree/main/1_DDC_Toolkit/Cost-Management/change-order-processor].

The manifest declares version 2.0.0, names instructions.md as its entry point and requires OpenClaw 0.8.0 or later. This is an assistant skill with Python code embedded in documentation; the supplied folder contains no separate Python application.

Assessment

The resource offers a concrete starting point for a change-order log: it represents individual changes, calculates their costs, records review actions and separates approved amounts from pending amounts. Its usefulness depends on someone supplying reliable quantities, prices and schedule impacts.

The stated benefits include faster processing, accurate pricing and a complete audit trail. No measurements establish those benefits. The example lacks durable storage, authenticated approvals and a complete history export, so it does not establish the controls needed for a shared contractual record.

Users

Construction project managers, estimators and cost controllers may find the record structure useful for organizing owner requests, design changes, field conditions and other change categories. A developer can adapt the Python classes to an existing project workflow.

Beginners can follow the documented sequence, but turning it into a working assistant integration or reusable program requires technical setup. Teams needing signed approvals, multiple permission levels or reliable records across sessions would need additional implementation.

Capabilities

The Python example creates numbered change orders, adds itemized costs and markups, stores manually entered schedule impacts and records reviewer or approver names, comments and dates. It also stores fields for references such as RFIs, drawings and specification sections.

Summary methods calculate approved changes, pending changes, the current contract value and a potential contract value including pending amounts. Excel export writes Summary and Change Orders sheets, plus a Cost Details sheet when cost items exist.

The assistant instructions describe accepting CSV, Excel, JSON or direct input and offering several export formats. The shown Python implementation accepts method arguments and exports Excel; it supplies no CSV, Excel or JSON file import routines and no CSV or JSON file export routines.

Using it

Requirements

SKILL.md declares Python 3 and lists macOS, Linux and Windows. The example imports pandas, and its Excel export explicitly uses openpyxl. Dependency versions and a precise minimum Python version are not specified.

For assistant-host use, claw.json declares filesystem permission, OpenClaw 0.8.0 or later and model patterns claude-* and gpt-*. These are compatibility declarations, not evidence that particular models or host versions work.

Users must supply the original contract value, change details, quantities, unit costs and any schedule impact. The code contains no price database lookup, document extraction or schedule calculation.

Mechanism

The assistant entry instructions describe gathering project data and using the methods in SKILL.md. The embedded Python is deterministic: it contains no model API call, AI estimation method or automatic approval decision.

Each item costs quantity multiplied by unit cost multiplied by one plus its markup. Despite the name markup_percent, a 10% markup must be supplied as 0.10. Direct cost is the sum of these item totals; overhead is added next, and profit is calculated on direct cost plus overhead.

Change orders live in a dictionary inside one processor instance. The documented workflow moves from draft to review, then approval. Contract totals include approved changes; pending totals include both review and approval queues.

Setup

For assistant use, the manifest identifies instructions.md as the entry point, and that file refers to SKILL.md for implementation details. Exact installation, loading and activation steps for OpenClaw are not documented in the supplied folder.

For direct Python use, a developer would need to place the embedded implementation in a Python module and make pandas and openpyxl available. The quick start then initializes a processor, creates a change order, adds costs, sets an impact and submits it for review.

There is no supplied persistence setup or reload procedure. Exporting a workbook does not provide a corresponding method for restoring the processor's records.

Example

The quick start uses a project contract value of 50,000,000 and a request for 50 electrical outlets. Its material line is 50 multiplied by 150, and its labor line is 25 hours multiplied by 85. It also assigns a five-day schedule impact.

Calculated from the written formulas, those lines produce 9,625 in direct cost, 962.50 in overhead and 1,058.75 in profit, totaling 11,646.25. These are arithmetic deductions from the example, not observed execution results; the currency and market validity of the rates are unspecified.

The quick start stops at pending review. At that point, the amount belongs in pending changes, and the current contract remains unchanged. The documented follow-up calls record review and approval; once approved, the amount contributes to the current contract and the five days contribute to the aggregate schedule impact.

Assessment & evidence

Limitations

Records exist only in memory, and numbering restarts for each processor instance. Approver identities are supplied as text, with no authentication or permission checks. Approval and rejection methods do not enforce the preceding status, and cost or schedule fields can still be changed after approval.

Although the assistant instructions request validation, the implementation does not enforce numeric ranges or currency rules. Monetary calculations use floating-point numbers without an explicit rounding policy. Passing zero for overhead_rate or profit_rate selects the 10% default because the constructor uses an 'or' expression.

The Excel log omits approval history, several reference fields, affected activities and parts of the full change record. It therefore cannot substantiate the stated complete audit trail. A void status is defined, but no dedicated void operation is supplied.

Interpreting results

The current contract is the original contract plus approved change amounts. The potential contract adds changes under review or awaiting approval. Neither value estimates actual spending, cash flow or the likelihood of pending changes being approved.

Cost totals grouped by change type include every status, including rejected changes, so they should not be read as approved commitments. The change percentage is rounded to one decimal place; a small nonzero change can consequently appear as 0.0%.

Schedule reporting simply sums the entered days for approved changes. It does not analyze overlapping delays, activity dependencies or the critical path, so the result is not an established project completion forecast.

Alternatives

If assistant interaction is unnecessary, adapting the supplied Python classes directly is an option because the calculations contain no model dependency. A controlled spreadsheet is another option to consider for a manually maintained cost log.

For shared contractual approvals, compare systems that provide durable storage, authenticated roles, revision history and complete record exports. These are needs-based alternatives inferred from this implementation's gaps; the supplied evidence establishes no named competitor comparison, pricing or migration effort.

Evidence

SKILL.md supplies the implementation, quick start and business claims. claw.json supplies package metadata and host declarations. instructions.md supplies the assistant role and intended input/output behavior. The root LICENSE and NOTICE supply the applicable rights statements and exclusions.

The captured material contains no execution results, automated test results, compatibility demonstrations or measured approval-time improvements. Nothing was executed. Findings about calculations and missing controls follow from the written code, not from observed runtime behavior.

Access & freshness

Costs

No purchase price, subscription, support charge or operating-cost estimate is stated. The MIT license permits reuse without a license fee under its terms. Model-provider charges, hosting costs and developer effort remain unknown.

The Python example contains no model API call, so a per-change AI usage cost cannot be inferred. Its contract values and unit rates are demonstration inputs, not resource pricing or verified construction prices.

Rights

The manifest declares MIT, and the repository NOTICE explicitly applies MIT to skill instructions and documentation. The LICENSE permits use, modification and redistribution, including commercial use, provided the copyright and permission notice accompany copies or substantial portions. It supplies no warranty.

The separately licensed book and CWICR database described in NOTICE are outside this skill folder. Their rights should not be inferred from the skill's MIT license. The book chapter and AIA G701 references do not establish that their contents are included or that this implementation satisfies contractual requirements.

The repository notice calls for qualified human review of estimates and contractual decisions, and verification of prices and quantities before binding use.

Freshness

The source snapshot is pinned to revision 410ed1e71e4a5c6fd231afd0c8d1e586a9f546e8 and was captured on 17 November 2026 at 12:18:59.957 UTC. The manifest reports version 2.0.0.

The capture timestamp does not establish a release date or maintenance history. The commit date, later changes and current contents of the moving main branch are unknown.

Next steps

Before relying on the calculations, check known cost cases, decimal markup inputs, zero overhead and profit rates, and the treatment of credits. Agree on currency and rounding rules, then compare summary and workbook values with independently calculated expectations.

For team use, add persistent storage, authenticated approval permissions, allowed status transitions and controls over edits after approval. Ensure exported records preserve approval history and supporting references.

Confirm the assistant host and dependencies work in the intended environment. Keep schedule impacts subject to separate schedule analysis and have qualified project professionals review estimates and contractual decisions.